Highway 417 CPR  O-Train Bridge Replacement
  • Home
  • Project Location
  • Reports / Presentations
  • Contact Us
  • Accueil
  • L‘Emplacement du Projet
  • Rapports / Présentations
  • Personne-Ressource
  • Home
Project Reports

Design and Construction Report
A Design and Construction Report (DCR) was prepared for the project and made available for a 30-day public review period from March 28, 2018 to April 30, 2018. The DCR is available via the following link.
  • Design and Construction Report (DCR)
  • Appendix A
  • Appendix B
  • Appendix C
  • Appendix D
  • Appendix E
  • Appendix F
  • Appendix G
Presentations

Public Information Centre

A Public Information Centre (PIC) was held on February 22, 2018.

To download the Public Information Centre display materials for optimal resolution or offline viewing, please click here. 


Notices
Notice of Study Commencement

Notice of Public Information Centre

Notice of Design and Construction Report Submission

 © 2017, WSP Canada Group Limited
  • Home
  • Project Location
  • Reports / Presentations
  • Contact Us
  • Accueil
  • L‘Emplacement du Projet
  • Rapports / Présentations
  • Personne-Ressource
  • Home